Kinder Australia · Project RadarFind, running. Qualify and Respond on a package.v4 · 2026-09-10

The prioritized call list, running live

Every conveyor, terminal and bulk-materials-handling project announced anywhere in Australia, read from the public record every week, grouped by owner, contractor, location and likely conveyor duty, and ranked by how soon someone has to buy. Two lists come out, one for WA and one national, with a door named on every row and the dates to call around. Agents do the reading; nobody at Kinder asks them to.

01

In the owner's words

Attalis Capital's February 2026 investor letter describes what Kinder wants from AI in one sentence. This page is that sentence, running.

Attalis Capital, investor letter, February 2026, "Kinder - AI in project targeting and customer development"
"AI mines project databases, ASX announcements and engineering news for bulk-material handling, terminal and conveyor projects, then groups them by owner, EPC / EPCM, location and likely conveyor duty to give the WA and national teams a prioritised call list"
Read on
7 September 2026, attaliscapital.com.
What this is
Both lists, built from public sources on 7 September 2026 and refreshed on 8 September, every row carrying its source. Not a database subscription and not a slide: the same read runs every week without anyone asking it to.
02

WA call list, top ten

Ranked by how soon someone has to buy idlers, cleaners, skirting, impact beds, liners or dust control: commissioning and construction first, then FID, then approvals. Where the owner's project team isn't publicly reachable, the door is the contractor's package manager.

#ProjectOwner · contractorStageConveyor duty, as publishedDoor
1Western Ridge Crusher, NewmanBHP · Sedgman and CPB JV, A$757mCommissioning Q1 FY202730 Mtpa primary crusher, 12 km overland conveyor, radial stacker. First-fill and the spares pattern are being set now.Sedgman/CPB package managers, then BHP Newman operations
2Port Debottlenecking Project 2, Car Dumper 6, Nelson PointBHP · Fluor EPCM; Monadelphous ~A$200m; CivmecA$1.4bn, under construction, first ore late 202816,000 t/h car dumper into ~5 km of yard and shiploading conveyors; the scope names "additional conveyors".Fluor Perth first, then Monadelphous and Civmec
3Ministers North and the Yandi Eastern front endBHP · GR Engineering, A$229.5m EPCFID Jul 2026, long-lead ordering under way, first ore FY29New 20 Mtpa two-stage crushing plant: feed, discharge, transfer and stockpile conveyors, tie-ins to the existing overland conveyor and reclaimer. Idler sets and belt already tendered.GR Engineering, Perth; ICN WA for package visibility
4Cosmic Boy concentrator, ForrestaniaMedallion Metals · GR Engineering, A$50m EPCProcessing starts Oct 2026650 ktpa refurbished gold and copper concentrator. Commissioning consumables in the next few weeks: the shortest fuse on the list.GR Engineering; Medallion site readiness
5KCGM Growth Project, KalgoorlieNorthern Star · Primero, target-cost EPCUnder constructionCrushed ore conveyor, coarse ore stockpile feed conveyor, reclaim vault and tunnels, reclaim feeders, SAG mill feed conveyor.Primero package managers
6Onslow Iron, Ken's Bore to Port of AshburtonMineral Resources · in-houseRunning at 38 Mtpa; works to Q2 FY27Modular crushing, stacking, a 220,000 t shed and an enclosed reclaim conveyor to transhippers. Sustaining demand, live today.MinRes engineering and construction; Port of Ashburton operations
7Yitirrti, 144 km SE of Port HedlandDevelop Global · GR Engineering, A$275m EPCEPC Aug 2026, first concentrate mid-20281.5 Mtpa copper-silver-zinc plant: ROM, crushing, mill feed and concentrate handling conveyors being placed now.GR Engineering; Develop project team
8Iron Bridge magnetiteFortescue and FormosaOperating, 22 Mtpa; higher maintenance flagged FY27 to FY2925 conveyors, 1,400 mm belt, 5,000 t/h. Its package history lists rollers and frames, skirts, belt cleaners and covers as discrete packages. The replacement cycle is the opening.IB Operations maintenance and supply, Port Hedland
9P2000 expansion, PilgangooraPilbara Minerals · LycopodiumPre-FID; all major tenders promised on ICN WA GatewayNew ~2 Mtpa concentrate plant and crushing circuit. Idlers and impact beds already tendered in May 2026.Lycopodium; PLS project procurement; ICN WA
10Brockman Syncline 1, West PilbaraRio Tinto · Monadelphous SMP and E&I; NRWUnder construction, first ore 2027New primary crusher and overland conveyor to 34 Mtpa. The last named new overland conveyor in the majors' set.Monadelphous package managers; Rio Tinto Pilbara projects

Below the ten, also live in WA:

  • Davyhurst, 3.0 Mtpa gold plant, GR Engineering A$233m; Laverton, 1.5 Mtpa, GR Engineering A$110m.
  • Eneabba rare earths refinery, past halfway, peak construction late 2026.
  • The CBH receival network, about $500m to $600m a year on a standard design: Miling, Mingenew and Cunderdin this year, Ballidu and Perenjori next.
  • Alcoa and Worsley, the largest installed bauxite conveyor base in the country, changing hands in H1 2027.
  • Mulga Downs, which states no tenders release until FID, anticipated H2 2026.
03

National call list, top ten

#ProjectOwner · contractorStageConveyor duty, as publishedDoor
1Nolans rare earths, NTArafura Rare Earths · Hatch EPCMFID 21 May 2026; construction from Sep 2026A$1.27bn ore-to-oxide plant, ~30 months: crushing and mill feed conveying, reagent and product handling. Procurement roadshows already run in Alice Springs and Darwin.Hatch package managers
2Corvus metallurgical coal, Emerald QLDCorvus Resources · no EPC appointedFirst package to market 27 Aug 2026$1.24bn. The first package out was the underground conveyor systems; surface conveyors, wash plant and train load-out follow. A component preference gets designed in before an EPC exists.Corvus project team
3Eva Copper, Cloncurry QLDHarmony Gold · FEED and EPC via ICN QLDConstruction to ~Q3 2028Packages already run on ICN: Conveyor Components (EOI 0040), Conveyor Belt, Dust Collection, Reclaim Tunnel. A standing "Any Opportunities" EOI is open to 31 Mar 2027.ICN Queensland first (Harmony's stated preference), then the owner's procurement inbox
4Kangwinan, Cape York QLDRio Tinto · EPCM in placeBoard FID expected late 2026; 32-month buildTruck dump station, 15 km crude ore overland conveyor to the Amrun stockyard, product stacker, shiploading conveyor, new berth. Gearboxes and drives package already run.ICN Queensland; Rio Tinto Weipa projects procurement
5Dalrymple Bay Terminal, Hay Point QLDDalrymple Bay InfrastructureRL4 commissioning Dec 2026; SL1A handover before year endNew 5,300 t/h bucketwheel reclaimer and a new shiploader landing within months; "gallery wrapping" named as a forward capital category worth up to $100m per five years.DBCT operations and the NECAP delivery team
6HVO Continuation, Hunter Valley NSWHV Operations (Yancoal and Glencore)IPC determination due 30 Sep 2026Over $2.9bn combined: two CHPPs, an overland conveyor to the Newdell load point, product to Bayswater and Liddell by conveyor, and an upgrade to aged coal handling and train loading. The largest pending conveyor decision in the country.HV Operations projects
7Peak Downs continuation, Bowen Basin QLDBMAConstruction start listed 2026Up to 18 Mtpa product for ~93 years through the existing CHPP and rail loading: sustaining spend on a live plant.BMA Peak Downs maintenance and supply, Moranbah
8Port Waratah Coal Services, Newcastle NSWPWCS · Civmec (new K4 shiploader)SL7.10 refurbishment from Jul 2026; K4 operational 2028Shiploader boom conveying in staged outages: each outage is a component replacement window.PWCS asset team; Civmec
9Aurukun bauxite, Cape York QLDGlencore and MDP JVFederal decision 12 Feb 2027Up to 15 Mtpa ROM: beneficiation plant, "conveyors, stockpiles and stacker reclaimers", coastal loading hopper and conveyor.ICN Queensland; the JV
10Viterra Wolseley and the grain network, SAViterra · Aurizon on rail loading$50m, stage 1 under wayBunker storage and fast rail loading: belt tracking, dust and light-duty idlers. Grain is the least contested lane on the radar.Viterra project team, Adelaide

Also on the national list:

  • Green Iron SA and the Port Pirie export hub: the design premise is covered storage and sealed conveyors, so the conversation is specification, not price.
  • Jervois copper, FID targeted Q3 CY2026, Sedgman.
  • Metro Mining's Bauxite Hills; Heidelberg Materials' 500 tph Wolffdene plant; Boral's quarry control rollout.
04

One conversation, several plants

In this market the contractor relationship beats the owner relationship. One approved-vendor conversation with the right EPC lands on every plant it is building.

ContractorLive conveyor-bearing workWhy one conversation counts
GR Engineering Services, PerthMinisters North A$229.5m · Yitirrti A$275m · Davyhurst A$233m · Laverton A$110m · Cosmic Boy A$50mFive plants in three commodities in one year
MonadelphousPDP2 Car Dumper 6 ~A$200m · Finucane Island car dumper A$175m · Brockman Syncline 1 · a A$300m Rio Pilbara maintenance contract to 2031Specifies and installs what sits on the structure across four Tier 1 assets
FluorPDP2 EPCMHolds the packages on the largest live conveyor build
HatchNolans EPCMHolds the clearest open greenfield window
Sedgman (with CPB)Western Ridge · Jervois EPC pendingCommissioning now; FID pending
PrimeroKCGM GrowthShared-savings EPC, the right frame for a wear-life pitch
LycopodiumP2000 detailed engineeringPre-FID, packages to ICN WA
CivmecPDP2 footings · Port Waratah K4 · Western Range historyFabricates the machines the components bolt to

The same public pages name the incumbents: PROK holds the Ministers North pulleys and is on Iron Bridge; thyssenkrupp took the Iron Bridge radial stacker; Fenner Conveyors holds the Rio and Roy Hill belt supply and pitches ports as a single-source turnkey supplier "from belts and pulleys to idlers, transfer points, and loading zones". Knowing who's in the room before the call is part of the list.

05

Dates to call around

The same projects as a calendar. Each date is a published decision, start or handover that moves a buying window, and the right call lands before it, not after. The radar re-reads these every week and moves them when the source does.

WhenWhatWhy it moves a call
30 Sep 2026HVO Continuation IPC determinationThe largest pending conveyor decision nationally
Oct 2026Cosmic Boy processing startsShortest-fuse first-fill on the radar
Q3 CY2026Jervois FID targetPackages follow the mills
H2 2026Mulga Downs FIDA published gate: no tenders release before it
Late 2026Kangwinan board FIDCall before the board decision, not after
Dec 2026DBCT RL4 commissioning and SL1A handoverTwo machines land
Q1 FY2027Western Ridge commissioningThe spares pattern gets set
12 Feb 2027Aurukun federal decisionPre-position before approval
31 Mar 2027Eva Copper "Any Opportunities" EOI closesA standing door, open now
06

The public tender layer: thin by fact

Nothing conveyor-component was open on any Australian public tender portal on 7 September 2026. That's a finding, not a search failure. Government-owned ports and generators buy the asset, not the consumable: every government port item on the record in five years is a works package, and the consumables sit inside standing-offer arrangements or behind invitation-only portals. The private majors are the opposite. They publish idler and pulley packages several times a quarter, open for about two weeks, and the same read that builds the lists above catches them.

BuyerPackageWindowScope line, as publishedFit
BHP Iron OreConveyor Idlers, Ministers North Project4 to 19 Jun 2026"design, manufacture, surface treatment and packaging for transport of Conveyor Idler sets, including... Idler rollers, Idler frames & Wind guards"STRONG
Pilbara MineralsConveyor Idlers, P2000 Expansion Project5 to 25 May 2026"all carrying, return, impact, impact beds and training idlers, frames, rollers and associated ancillary equipment"STRONG
Rio TintoRTIO Conveyor Pulley Supply and Associated Services, EOI-0201625 Jul to 7 Aug 2026Conveyor pulleys, off-site repair, technical supportSTRONG
Rio Tinto, Brockman Syncline 1BS1/M/SM/2104 Conveyor Idlers, ICN Gateway work package21 Mar to 4 Apr 2024, awardedOne of 32 packages on the project page; awarded to Conveyor Products Solutions. Found by the scan on its own on 8 September, its first sweep with conveyor terms.POSSIBLE · history
Rio Tinto, Brockman Syncline 1BS1/M/SM/2105 Conveyor Pulleys, ICN Gateway work package16 to 30 Apr 2024, awardedAwarded to PROK Conveyor Components. First ore is 2027, so the sustaining cycle on both packages starts then.POSSIBLE · history

Three more sit on the record as supply-into rather than supply: Rio Tinto's CLAHDO stacker and shiploader upgrades, which name belt cleaners, spray bars, pulleys, idlers and skirting inside a works package; Gladstone Ports' under-conveyor guarding on nine conveyors at RG Tanna, the clearest government-owned component content in five years; and Fremantle Ports' belt maintenance panel, services only, where the consumables line never surfaces publicly and the move is a phone call.

Whether anyone at Kinder saw the BHP, Pilbara Minerals and Rio Tinto packages isn't knowable from outside, and this page doesn't guess. It says only that the radar sees them, that three came from Kinder's own named customers inside four months, and that both Brockman Syncline 1 packages were found by the scan running on its own. Each closed inside two weeks of opening: the window a keyword alert has to catch.

20,797
notices judged across eleven public sources since 26 July 2026, each against Kinder's catalog, with the descriptions of 18,602 closed tenders in hand. Nothing to do with almost all of it.
124
projects and work packages on the forward radar, across 100 projects, from ICN Gateway and the WA EPA: the raw material for the two lists.
8
component packages and arrangements verified on the public record, each carrying its source.
1
package flagged STRONG in the record today: Eva Copper's "EOI 0040 - Conveyor Components" on ICN Gateway. Closed, so it's intelligence, not a bid: it proves that buyer procures components as a discrete package and names the exact channel.

How it judges a package

Layer 1 · product
Does the package want something Kinder supplies?
Grounded in the public catalog: 120 products across belt support and load zones, skirting and sealing, belt cleaning, rollers and idlers, pulleys and lagging, tracking, flow aids and liners, safety switches, guards and covers, dust suppression.
Layer 2 · market
Is this an owner, contractor or site Kinder would chase?
Mining owners and EPCMs, bulk ports and terminals, government-owned coal generators, grain, cement and quarry, alumina, steel, sugar, resource recovery. Water and sewage, baggage and parcels, fleet and workshop are demoted.
Fit
Product tier, shifted by market
Positive: up one tier. Negative: down one tier, floor WATCH. Projects with no package yet score on market alone and are grouped by owner, contractor, state and duty.
Defence, for the recordDefence buys through limited tender and small lines. It is evidence of a market shape, never the value proposition here. The radar caps it and points at mining, ports, grain and cement instead.
07

After a yes: Qualify and Respond

When a package clears both layers, the agent opens the notice, downloads the pack (today the agent fetches VendorPanel itself; for ICN packages and the majors' portals a person pulls the pack and the agent takes it from there) and reads it against Kinder's catalog and the gates that matter: FRAS, insurance, portal registration. It writes a one-page brief: what is asked, which Kinder products answer it line by line, which gates are met, unknown or missing, and a recommendation: bid, no-bid, or needs a human. Every brief goes to one person, whatever the recommendation. Yes or no, with a reason, in one line. The record keeps the decision so the same package never asks twice.

For a project on the two lists there's no pack to bid on. The question is call, skip or later. Today the lists are what runs, refreshed every week. The call brief behind each row, naming the door and the argument, is the next build.

Respond starts when Kinder says bid. The same system turns the pack into the response: every requirement extracted and page-cited, a compliance matrix, a crosswalk from each requirement to the Kinder product that meets it, and a response scaffold in which every claim is cited to the pack or the catalog, or left blank for the estimator. On a public utility supply pack of 990 pages, the system extracted 502 distinct, page-cited requirements and built the matrix and crosswalk in a day. The system compiles; it runs with a person at the keyboard driving the agents, in hours, and a person reads every page.

The public portals are one of three sources. The same brief and the same response run on the packages the majors and EPCMs send by invitation after the public teaser, built like a public pack with a shorter window, once the radar is pointed at Kinder's own inbox and portal accounts. That third source starts on engagement, never from outside.

What it never does: it never sets a price, never chooses the final product, never signs, and never lodges or contacts a buyer in Kinder's name. Those stay with the people who own them.